Top Tank:
This tank has a 2.50 diameter hose connection 13.00″ from the edge of the tank to the center of the hose connection (4.00″” long)
2 – 1/4″” NPT flanges located just above the de-airation baffle 9.00″” and 12.00″” from the edge of the tank
1/4″” NPT flange on the top of the tank for a vent tube
Each end of the tank has a 9/16″” diameter hole for lifting
Bottom Tank:
This tank has a 2.75″” diameter hose connection 11.00″” from the edge of the tank to the center of the hose connection (angled 15 degrees upwards
Product OEM
| Year-from | 1970 |
|---|---|
| Year-to | 1970 |
| Product-oem | 3MF5490M |
| Make | Equipment |
| Product Type | Radiator Tanks And Parts |
ADDITIONAL PARTS YOU MAY NEED
Lift Trucks & Equipment
Radiators
GMC
- GMC
- N/A
Generator Radiator
GMC Powerunit
CORE DIMENSIONS
- 25.62"
- 2.12"
- 1.75" Top Center
- 2.00" Bottom Right
Lift Trucks & Equipment
Radiator Tanks And Parts
Caterpillar
- Caterpillar
- N/A
2 bolt on flanges
Each 3.00 diameter
1 – 1/4″ NPT fitting in center
“””
CORE DIMENSIONS
- N/A
- N/A
- N/A
- N/A
Lift Trucks & Equipment
Radiators
Bobcat
- Bobcat
- N/A
Bobcat Radiator
Fits 645, 743, 743B & 743DS Models
CORE DIMENSIONS
- 11.37"
- 2.75"
- 4.00"
- 4.00" 1.25" 1.25"
Lift Trucks & Equipment
Radiators
Hyster
- Hyster
- N/A
Hyster Forklift Radiator
CORE DIMENSIONS
- N/A
- N/A
- N/A
- N/A
Lift Trucks & Equipment
Radiators
Toyota
- Toyota
- N/A
Toyota Forklift Radiator
CORE DIMENSIONS
- 17.75"
- 2.37"
- N/A
- N/A
Lift Trucks & Equipment
Radiators
Toyota
- Toyota
- N/A
Toyota Forklift Radiator
9.00 Oil Cooler
CORE DIMENSIONS
- 16.75"
- 2.50"
- 4.00"
- 4.00" 1.31" Upper Left 1.31" Lower Right
Lift Trucks & Equipment
Radiators
Toyota
- Toyota
- N/A
Toyota Forklift Radiator
CORE DIMENSIONS
- 18.25"
- 2.00"
- N/A
- N/A
Lift Trucks & Equipment
Radiators
Bobcat
- Bobcat
- N/A
Bobcat Radiator
Fits 443, 443B, 453C, 453D, 453F, 463, 543, 543B, 553, 553C, 553G, & 553F Models
CORE DIMENSIONS
- 9.37"
- 2.62"
- 4.00"
- 4.00" 1.00" 1.00"





Product Comment
Top Tank:
This tank has a 2.50 diameter hose connection 13.00″ from the edge of the tank to the center of the hose connection (4.00″” long)
2 – 1/4″” NPT flanges located just above the de-airation baffle 9.00″” and 12.00″” from the edge of the tank
1/4″” NPT flange on the top of the tank for a vent tube
Each end of the tank has a 9/16″” diameter hole for lifting
Bottom Tank:
This tank has a 2.75″” diameter hose connection 11.00″” from the edge of the tank to the center of the hose connection (angled 15 degrees upwards